-
Phase 1
Following on from our work with large format floor and roof panels for houses, it was felt suitable commercial buildings could be assembled from large ply and timber panels.
-
Phase 2
There is a perceived gap in the market, which is beyond the scope of steel framed and clad buildings, but before tilt up concrete becomes feasible. This is particularly so where environmental and comfort considerations need be made.